Reid Avenue, Hawera Reticulation Renewal (Новая Зеландия - Тендер #70651046) | ||
| ||
| Для перевода текста тендера на нужный язык воспользуйтесь приложением: | ||
Страна: Новая Зеландия (другие тендеры и закупки Новая Зеландия) Организатор тендера: New Zealand Government Electronic Tenders Service Номер конкурса: 70651046 Дата публикации: 11-02-2026 Источник тендера: Государственные закупки Новой Зеландии |
||
| RFx ID : | 33217510 |
| Tender Name : | Reid Avenue, Hawera Reticulation Renewal |
| Reference # : | PJ70041 |
| Open Date : | Monday, 15 December 2025 4:00 PM (Pacific/Auckland UTC+13:00) |
| Close Date : | Friday, 13 February 2026 4:00 PM (Pacific/Auckland UTC+13:00) |
| Tender Type : | Request for Tenders (RFT) |
| Tender Coverage : | All of Government [?] |
| Categories : |
|
| Regions: |
|
| Exemption Reason : | None |
| Required Pre-qualifications : | None |
| Contact : |
Armand Aguja armand.aguja@stdc.govt.nz 02102921826 |
| Alternate Physical Delivery Address : | NA |
| Alternate Physical Fax Number : | NA |
The Ø50mm Galvanised Iron (GI) rider main along Reid Avenue was installed in 1960 and has now reached the end of its serviceable life. The condition of the pipe is very poor with requirement
of frequent repairs due to burst and leaks. This project involves replacement of approximately 620 meters of the existing Ø50mm galvanised iron rider main with 63 OD PE along Reid
Avenue.
The works involve the renewal and upgrade of the water reticulation system (Rider-main) along Reid Avenue, Hawera, covering approximately 620 metres of DN63 pipeline. The contractor shall
supply all materials, plant, labour, and supervision required to complete the installation using open trench or under-boring methods, including associated fittings, valves, elbows, and service
connections. The scope includes site establishment, traffic management, potholing and protection of existing services, trench excavation or under-boring, pipe laying, embedment, backfilling,
and reinstatement of road surfaces, footpaths, and grass berms. Additional tasks include pressure testing, disinfection, commissioning, and preparation of as-built documentation and asset data.
The contractor must also manage health and safety, environmental compliance, and stakeholder communication throughout the project, ensuring completion within the specified contract period and
to the standards outlined in NZS3910:2013 and STDC requirements.