Whakatāne Project Future Proof – Stage 3C - Mātaatua Reserve (Новая Зеландия - Тендер #69029954) | ||
| ||
| Для перевода текста тендера на нужный язык воспользуйтесь приложением: | ||
Страна: Новая Зеландия (другие тендеры и закупки Новая Зеландия) Организатор тендера: New Zealand Government Electronic Tenders Service Номер конкурса: 69029954 Дата публикации: 04-12-2025 Источник тендера: Государственные закупки Новой Зеландии |
||
| RFx ID : | 33003058 |
| Tender Name : | Whakatāne Project Future Proof – Stage 3C - Mātaatua Reserve |
| Reference # : | CON001924 |
| Open Date : | Thursday, 13 November 2025 1:00 PM (Pacific/Auckland UTC+13:00) |
| Close Date : | Friday, 5 December 2025 4:00 PM (Pacific/Auckland UTC+13:00) |
| Department/Business Unit : | BOPRC Procurement |
| Tender Type : | Request for Tenders (RFT) |
| Tender Coverage : | Sole Agency [?] |
| Categories : |
|
| Regions: |
|
| Exemption Reason : | None |
| Required Pre-qualifications : | None |
| Contact : |
Polly Jones-Morris - Commercial Support procurement@boprc.govt.nz |
| Alternate Physical Delivery Address : | procurement@boprc.govt.nz |
| Alternate Physical Fax Number : |
Bay of Plenty Regional Council (BOPRC) invites tenders from suitably qualified construction contractors for Whakatāne Project Future Proof – Stage 3C (Mātaatua Reserve).
Scope of Works includes:
- Construction methodology to reinstate flood protection to required levels during forecast flood risk.
- Full compliance with the Contaminated Site Management Plan (CSMP) and resource consent conditions, including erosion and sediment control.
- Establishment of working areas, service protection, survey setout, temporary access, environmental controls, and traffic management.
- Protection and management of Pohutukawa trees.
- Stopbank works: topsoil stripping, certified fill placement in compacted lifts, shaping and compaction to design profile.
- Removal and reinstatement of cobblestone footpath.
- Topsoiling and site reinstatement.
- Public interface management to minimise disruption.
- Submission of as-built drawings and all required documentation for compliance.