Hollyford Track - Swamp Creek Bridge Replacement Project (Новая Зеландия - Тендер #66427996) | ||
| ||
Для перевода текста тендера на нужный язык воспользуйтесь приложением: | ||
Страна: Новая Зеландия (другие тендеры и закупки Новая Зеландия) Организатор тендера: New Zealand Government Electronic Tenders Service Номер конкурса: 66427996 Дата публикации: 22-08-2025 Источник тендера: Государственные закупки Новой Зеландии |
||
RFx ID : | 32102730 |
Tender Name : | Hollyford Track - Swamp Creek Bridge Replacement Project |
Reference # : | SSI-O-587 |
Open Date : | Monday, 21 July 2025 12:00 PM (Pacific/Auckland UTC+12:00) |
Close Date : | Tuesday, 26 August 2025 12:00 PM (Pacific/Auckland UTC+12:00) |
Tender Type : | Request for Tenders (RFT) |
Tender Coverage : | Sole Agency [?] |
Categories : |
|
Regions: |
|
Exemption Reason : | None |
Required Pre-qualifications : | None |
Contact : |
DOC Procurement Team tenders@doc.govt.nz N/A |
Alternate Physical Delivery Address : | N/A |
Alternate Physical Fax Number : | N/A |
The five-year SSI Flood Recovery Programme was stood up to repair and rebuild DOC infrastructure damaged following a severe flood event in February 2020. Swamp Creek Bridge was one such asset
damaged. Although temporarily repaired as part of Tranche 1 of the Programme, full bridge replacement in a more resilient location is planned for Tranche 2.
Swamp Creek Bridge (Fiordland National Park) is located on the Hollyford Track, approximately 45min walk from the trailhead on the Lower Hollyford Road. The Swamp Creek site previously had two
bridges: the main 18m alloy truss bridge and a smaller steel truss bridge over an adjacent water channel. The 2020 floods destroyed the smaller steel truss bridge, but the 18m bridge was
unaffected. However, the resilience of the existing bridge is relatively low, hence this project is a longer-term solution for this site.
A Detailed Business Case (DBC) for this project was approved on 12 May 2025. It allows for the construction of a new, 59 m long Swamp Creek suspension bridge in a more resilient location. The
existing bridge will be removed from site and repurposed at another yet to be determined location.
The purpose of this procurement is to source a construction contractor to build a new Swamp Creek Bridge. The scope of the works is therefore to:
1) Supply and construction of the 59m span Swamp Creek suspension bridge (as per approved design and specifications), and
2) All associated establishment, disestablishment, and other works necessary to complete the bridge construction works (to the agreed design and specification).
3) Minor track works (to connect bridge to existing track).