Main Building Contractor for Tauraroa Area School Electrical & HVAC Project (Новая Зеландия - Тендер #48025713) | ||
| ||
| Для перевода текста тендера на нужный язык воспользуйтесь приложением: | ||
Страна: Новая Зеландия (другие тендеры и закупки Новая Зеландия) Организатор тендера: New Zealand Government Electronic Tenders Service Номер конкурса: 48025713 Дата публикации: 13-11-2023 Источник тендера: Государственные закупки Новой Зеландии |
||
| RFx ID : | 28272293 |
| Tender Name : | Main Building Contractor for Tauraroa Area School Electrical & HVAC Project |
| Reference # : | 245311 & 245312 |
| Open Date : | Monday, 16 October 2023 9:00 AM (Pacific/Auckland UTC+13:00) |
| Close Date : | Wednesday, 15 November 2023 5:00 PM (Pacific/Auckland UTC+13:00) |
| Department/Business Unit : | Board of Trustees - Approve by BoT - ie. School Principal |
| Tender Type : | Request for Tenders (RFT) |
| Tender Coverage : | Sole Agency [?] |
| Categories : |
|
| Regions: |
|
| Exemption Reason : | None |
| Required Pre-qualifications : | None |
| Contact : |
All enquiries to be made through the GETS Question & Answer function |
| Alternate Physical Delivery Address : | All submissions to be made through the GETS website |
| Alternate Physical Fax Number : |
Assessment of Tauraroa Area Schools 10YPP identifies the requirement for the electrical and HVAC replacement and upgrade works. The works are to be completed during Term 4 school holidays
(December 2023 – January 2024).
The Contract Works required are:
Electrical:
• Block 1 –
Admin & Rear Offices: Remove need for multiboxes by installing additional outlets.
Admin MSB Room: Fit cover over ceiling cable duct
Server Room: Upgrade switchboard to comply with MOE specification. Fit lid to trunking to comply.
Room 17: Lighting to LED
Computer Room 17: Change lighting to LED, install additional outlets to remove the use of multiboxes
Rooms 8 & 9: Security lighting and some internal ighting to be changed to LED.
Room 18 & Resource Room: Lighting to be changed to LED
Room 21: Upgrade switchboard, repair floor boxes and install additional outlets
Room 19 Lighting to be changed to LED and replace old power outlets.
• Block 2 - Rooms 1, 2 & Resource: Lighting to be changed to LED, fit RCD and saddle external cable.
• Block 34 – Room 3: Upgrade RCD’s
• Block 3 – Rooms 4, 5 & 6: Upgrade switchboard. Fit additional outlets.
• Block 4 – Woodtech Room: Switchboard to be replaced. Ensure emergency stops are working and connected.
• Block 5 – Room 25A: Upgrade switchboard
• Block 10 – Kiln: Replace light with LED.
• Block 11 – Swimming Pool Pump Shed: Switchboard upgrade, power outlet cover, install outlets and new LED light.
• Block 27 – Sports Coordinator: Upgrade lighting to LED, install new earth and install RCD to switchboard.
• Block 31 – Library: Upgrade switchboard
• Block 32 – Science Lab 2: Fit larger switchboard.
• Block 33 – E Block: Install additional outlets, fit RCBO to light circuits and fit correct MCB
• Site : Route identification, mains into building from transformer and walkway need electrical works
• Block 39 - Room 28 & 29 - O1 & O2: Switchboard blanks and RCD’s to light circuits.
HVAC:
Block 1 - Admin Rear Rooms, Server Room and Rooms 17, 17B & 17C: Upgrade heating and lifecycle replacement.
Block 2 – Rooms 1, 2 & Resource Room: Replace ceiling heaters and lifecycle replacement of HVAC
Block 3 – Rooms 4, 5 & 6: Lifecycle replacements
Block 4 – Woodtech Room: Lifecycle replacement
Block 5 – Rooms 25 & 25A: Lifecycle replacements
Block 32 – Science Labs 1 & 2: Lifecycle replacements
Site visits will be arranged via tender addendum - please do not contact the school