Registration of Interest for a Main Contractor for External Lifts (3no) Replacement at Albany Junior High School (AJHS) (Новая Зеландия - Тендер #46532951) | ||
| ||
| Для перевода текста тендера на нужный язык воспользуйтесь приложением: | ||
Страна: Новая Зеландия (другие тендеры и закупки Новая Зеландия) Организатор тендера: New Zealand Government Electronic Tenders Service Номер конкурса: 46532951 Дата публикации: 29-09-2023 Источник тендера: Государственные закупки Новой Зеландии |
||
| RFx ID : | 28093368 |
| Tender Name : | Registration of Interest for a Main Contractor for External Lifts (3no) Replacement at Albany Junior High School (AJHS) |
| Reference # : | 6948-22-04 |
| Open Date : | Friday, 15 September 2023 9:00 AM (Pacific/Auckland UTC+12:00) |
| Close Date : | Monday, 2 October 2023 5:00 PM (Pacific/Auckland UTC+13:00) |
| Department/Business Unit : | Board of Trustees - Approve by BoT - ie. School Principal |
| Tender Type : | Registration of Interest (ROI) |
| Tender Coverage : | Sole Agency [?] |
| Categories : |
|
| Regions: |
|
| Required Pre-qualifications : | None |
| Contact : |
Refer ROI documentation Refer ROI documentation |
| Alternate Physical Delivery Address : | All submissions to be made through the GETS website |
| Alternate Physical Fax Number : | N/A |
Albany Junior High School is located at 19 Appleby Road, Albany, Auckland.
The school was established in 2005 and provides modern facilities for years 7 through 10.
The school is replacing one non-performing lift with a new one and add two new lifts to assist the operation of the school (TOTAL 3 NEW LIFTS).
A summary of the main contractor works are:
• Demolition of existing concrete block lift shaft, steel roof structure and lift.
• Earthworks and associated structural work to create the new lift pits and construction of concrete block walls
• Installation of new underground drainage and other services to support the lifts
• Installation of new metal screens
• Installation of new concrete paving
• Installation of new structural steel required for the selected lifts. This will include the requirement for appropriate lifting eyes and support structure to accommodate the lifts.
• Installation of new roofing iron over the lift structure with associated gutters and downpipes.
• Installation of all electrical, mechanical, fire, security, IT, hydraulic and lighting required to support the lifts and associated work.
• Commissioning and certification of all three lifts.
No Site Visits Permitted during this ROI stage.