Submarine cable (Кипр - Тендер #11260699) | ||
| ||
Для перевода текста тендера на нужный язык воспользуйтесь приложением: | ||
Страна: Кипр (другие тендеры и закупки Кипр) Организатор тендера: EuroAsia Interconnector Ltd Номер конкурса: 11260699 Дата публикации: 12-02-2021 Сумма контракта: 27 153 084 096 (Российский рубль) Цена оригинальная: 460 000 000 (Евро) Источник тендера: Единая система закупок Европейского союза TED |
||
Engineering, Procurement, Construction and Installation of the HVDC cable system for the Israel – Cyprus Link of the EuroAsia Interconnector
EuroAsia Interconnector is a multi-terminal VSC-HVDC scheme which will connect Israel, Cyprus and Greece (Crete), and will comprise converter stations with sea electrodes, interconnected by cables. The project will allow the transfer of 1 000 MW between converter stations and the envisaged voltage level will be ±500 kV.
The scheme will be developed under five main tender procedures:
— procurement of the VSC HVDC converter stations;
— procurement of the HVDC cable system for the Cyprus-Greece (Crete) Link;
— procurement of the HVDC cable system for the Israel-Cyprus Link;
— procurement of the sea-electrode systems;
— procurement of the civil works.
This process concerns the third of the above tender processes and encompasses the engineering, procurement, construction and installation of the HVDC cable systems for the Israel-Cyprus Link of the EuroAsia Interconnector.
Detailed information is available in the ‘Invitation to participate in negotiated process with prior call for competition’ for the contract with title ‘Engineering, procurement, construction and installation of the HVDC cable system for the Israel – Cyprus Link of the EuroAsia Interconnector’ that can be found at www.euroasia-interconnector.com/procurement.
EPCI of the HVDC Cable System for Pole 1
Lot No: 1Israel, Cyprus and the Mediterranean basin between them.
Engineering, procurement, construction and installation of the HVDC cable system including all required offshore and onshore joints for Pole 1 of the Israel - Cyprus Link. The distance between the sea/land transition bays in Israel and Cyprus is approximately 310 km and the submarine cable will be laid at an approximate maximum water depth of 2 200 m. The distance between the sea/land transition bay and the Converter Station in Israel is approximately 2 km and in Cyprus is approximately 13 km. The land cable will be pulled through pre-installed concrete encased conduits.
The number of tenderers will not be limited to a maximum.
All qualified candidates satisfying the objective criteria will be invited to participate in the award stage of this negotiated procedure.
To qualify for participation in the Award stage, objective criteria/requirements for the personal situation, the economic and financial standing and the technical and professional ability of the candidates must be satisfied. Details for the qualification requirements are provided in the ‘Invitation to participate in negotiated process with prior call for competition’ for the contract with title ’Engineering, procurement, construction and installation of the HVDC cable systems for the Israel — Cyprus Link of the EuroAsia Interconnector’ that can be found at www.euroasia-interconnector.com/procurement.
Economic operators must request access to the system used for this pre-qualification phase via email in order to submit a ‘Request to Participate’ in the process. Detailed information is available in the ‘Invitation to participate in negotiated process with prior call for competition’ for the contract with title ‘Engineering, procurement, construction and installation of the HVDC cable systems for the Israel — Cyprus Link of the EuroAsia Interconnector’ that can be found at www.euroasia-interconnector.com/procurement.
Details regarding options will be provided to qualified candidates in the tender documents.
PCI 3.10.1 (part of PCI 3.10)
EuroAsia Interconnector is a cluster project of common interest (PCI 3.10) of the EU consisting of two PCIs:
— PCI 3.10.1: Israel-Cyprus,
— PCI 3.10.2: Cyprus-Greece (Crete).
The Project has been approved for grants by CEF in two occasions (Action 3.10.1-0028-CY-S-M-14 and Action 3.10.1-0004-CYEL-S-M-16).
EPCI of the HVDC Cable System for Pole 2
Lot No: 2Israel, Cyprus and the Mediterranean basin between them.
Engineering, procurement, construction and installation of the HVDC cable system including all required offshore and onshore joints for Pole 2 of the Israel — Cyprus Link. The distance between the sea/land transition bays in Israel and Cyprus is approximately 310 km and the submarine cable will be laid at an approximate maximum water depth of 2 200 m. The distance between the sea/land transition bay and the Converter Station in Israel is approximately 2 km and in Cyprus is approximately 13 km. The land cable will be pulled through pre-installed concrete encased conduits.
The number of Tenderers will not be limited to a maximum.
All qualified Candidates satisfying the objective criteria will be invited to participate in the award stage of this negotiated procedure.
To qualify for participation in the award stage, objective criteria/requirements for the personal situation, the economic and financial standing and the technical and professional ability of the Candidates must be satisfied. Details for the qualification requirements are provided in the ‘Invitation to participate in negotiated process with prior call for competition’ for the contract with title ‘Engineering, procurement, construction and installation of the HVDC cable systems for the Israel — Cyprus Link of the EuroAsia Interconnector’ that can be found at www.euroasia-interconnector.com/procurement.
Economic operators must request access to the system used for this pre-qualification phase via email in order to submit a ‘Request to participate’ in the process. Detailed information is available in the ‘Invitation to participate in negotiated process with prior call for competition’ for the contract with title ‘Engineering, procurement, construction and installation of the HVDC cable systems for the Israel — Cyprus Link of the EuroAsia Interconnector’ that can be found at www.euroasia-interconnector.com/procurement.
Details regarding options will be provided to qualified candidates in the tender documents.
PCI 3.10.1 (part of PCI 3.10)
EuroAsia Interconnector is a cluster project of common interest (PCI 3.10) of the EU consisting of two PCIs:
— PCI 3.10.1: Israel-Cyprus,
— PCI 3.10.2: Cyprus-Greece (Crete).
The Project has been approved for grants by CEF in two occasions (Action 3.10.1-0028-CY-S-M-14 and Action 3.10.1-0004-CYEL-S-M-16).
Criteria as stated in the ‘Invitation to participate in negotiated process with prior call for competition’ for the contract with title ‘Engineering, procurement, construction and installation of the HVDC cable system for the Israel – Cyprus Link of the EuroAsia Interconnector‘ that can be found at www.euroasiainterconnector.com/procurement.
Submission of deposits and/or guarantees is not required during the pre-qualification stage. The participation guarantee required during the award stage as well as any other guarantees/deposits that will be required during the tender process and/or from the awarded tenderer/contractor will be defined in the tender documents that will be provided to qualified candidates.
Details will be provided in the tender documents that will be provided to qualified candidates.
Consortia are not obliged to take a specific legal form in order to participate in the tender procedure. However, if applicable, the awarded consortium may be requested to take a specific legal form before the signing of the contract.
Interested economic operators should note that the awarded tenderer of any lot may be required to enter into an Interface agreement with the awarded tenderers of the other lots and/or the awarded tenderers/contractors of the other procurement procedures related with the implementation of the EuroAsia Interconnector such as, but not limited to, those defined in Section II.1.4).
EuroAsia Interconnector is a cluster project of common interest (PCI 3.10) of the EU consisting of two PCIs:
— PCI 3.10.1: Israel-Cyprus,
— PCI 3.10.2: Cyprus-Greece (Crete).
The Project has been approved for grants by CEF in two occasions (Action 3.10.1-0028-CY-S-M-14 and Action 3.10.1-0004-CYEL-S-M-16).
Every Economic operator being interested in the conclusion of a contract with the contracting entity shall be entitled to contest, by lodging an appeal, any enforceable act of the contracting entity related to the tender procedure which they consider as affecting their interests in an unlawful manner.
Every appeal, in accordance with the aforementioned, shall be lodged in writing against EuroAsia Interconnector Ltd, and should be received within 15 calendar days from the next day of the notification of the appealed decision at the address mentioned in Section VI.4.1), and examined by the responsible Appeals Committee assigned by the contracting entity, who after examining the appeal, shall, as soon as possible, issue a justified decision that will be provided in writing to the party lodging the appeal.
If such time limit elapses inactive, it shall be inferred that the appeal has been dismissed.
Every Economic operator being interested in the conclusion of a contract with the contracting entity shall be entitled to contest, by lodging an appeal, any enforceable act of the contracting entity related to the tender procedure which they consider as affecting their interests in an unlawful manner.
Every appeal, in accordance with the aforementioned, shall be lodged in writing against EuroAsia Interconnector Ltd, and should be received within 15 calendar days from the next day of the notification of the appealed decision at the address mentioned in Section VI.4.1), and examined by the responsible Appeals Committee assigned by the contracting entity, who after examining the appeal, shall, as soon as possible, issue a justified decision that will be provided in writing to the party lodging the appeal.
If such time limit elapses inactive, it shall be inferred that the appeal has been dismissed.