AB-2026-02643 - 2026 Wastewater Transmission Chamber Upgrades (Канада - Тендер #71655441) | ||
| ||
| Для перевода текста тендера на нужный язык воспользуйтесь приложением: | ||
Страна: Канада (другие тендеры и закупки Канада) Организатор тендера: www.merx.com Номер конкурса: 71655441 Дата публикации: 02-04-2026 Источник тендера: www.merx.com |
||
Engineering consulting services are required for the design and construction management of wastewater transmission chamber upgrades at two critical locations, with construction funding established for 2027 and 2028.
00004977680
Issuing OrganizationArrow Utilities
Solicitation TypeRFP - Request for Proposal (Formal)
Solicitation NumberAB-2026-02643
Title2026 Wastewater Transmission Chamber Upgrades
Source IDSCRIBE
Alberta
Purchase TypeNot Stated
2026/04/01 07:49:00 AM EDT
Closing Date2026/05/06 04:00:00 PM EDT
Garry Dang-Vuu
gdang-vuu@arrowutilities.ca
ARROW Utilities (ARROW), formerly known as the Alberta Capital Region Wastewater Commission, is requesting proposals from qualified engineering consulting firms who possess the required
personnel, experience, and resources for the provision of design and construction management for the replacement of concrete structures, intercepting chambers and valves at two (2) locations,
located at the Fort Saskatchewan River Crossing Siphon Chamber in Fort Lions Campground and the START/ Outfall Intercepting Chamber, in close proximity to 9 St. NE and south of 195 Avenue NE.
This project, of two Parts, is collectively named as the 2026 Wastewater Transmission Chamber Upgrades.
Part A) 3726.04 Fort Saskatchewan River Crossing Siphon Chamber Located in Fort Lions Campground, the existing siphon inlet chamber that includes the valve controlling flow to the river
crossing siphon is in poor condition with several broken valves. This chamber is a critical piece of infrastructure that enables all flows from Fort Saskatchewan to be transmitted under the
river toward the Fort Saskatchewan Pump Station. Due to this highly sensitive location, this project was the number 2 prioritized capital work in the latest Utility Master Plan (UMP) dated
October 9, 2025. UMP recommendations include demolishing the existing chamber structure and valves as well as bypassing all flow to the other pipe crossing for the period of construction.
Anticipated construction funding for Part A, Fort Saskatchewan River Crossing Siphon Chamber has been established for 2027.
Part B) 3726.05 START/ Outfall Intercepting Chamber Design Located approximately 850 m south of 195th Ave., near 9 St. NE, broken valve(s) within the existing chamber(s) need replacement to
enable flow back into the St. Albert Regional Transmission (START) line. Expectations for rehabilitation on the concrete chamber(s) themselves are also an expectation, as identified in the
UMP.
Anticipated construction funding for Part B) 3726.05 START/ Outfall Intercepting Chamber Design has been established for 2028.