AB-2026-01579 - TND0021894 – BF01916, Remove and Dispose of Existing Bridge Structure, Construct Structural Steel Girder Bridge and Other Work (Канада - Тендер #70930253) | ||
| ||
| Для перевода текста тендера на нужный язык воспользуйтесь приложением: | ||
Страна: Канада (другие тендеры и закупки Канада) Организатор тендера: www.merx.com Номер конкурса: 70930253 Дата публикации: 26-02-2026 Источник тендера: www.merx.com |
||
Tender for the removal of an existing bridge structure and construction of a structural steel girder bridge, including excavation, pile driving, reinforcing steel work, and asphalt concrete pavement installation.
00004918766
Issuing OrganizationTransportation and Economic Corridors
Solicitation TypeITB - Invitation to Bid (Formal)
Solicitation NumberAB-2026-01579
TitleTND0021894 – BF01916, Remove and Dispose of Existing Bridge Structure, Construct Structural Steel Girder Bridge and Other Work
Source IDSCRIBE
Alberta
Purchase TypeNot Stated
2026/02/25 10:46:00 AM EST
Closing Date2026/03/25 04:00:00 PM EDT
Kenneth Adagala
kenneth.adagala@gov.ab.ca
TENDERS will only be received by email before 2:01:00 P.M., for construction of the following work:
TND0021894
Remove and Dispose of Existing Bridge Structure, Construct Structural Steel Girder Bridge and Other Work
897:06 BF01916 Carrying Hwy 897 over Vermilion River 16 km North of Marwayne
kilometre 7.423 to 8.500
Central Region
APPROXIMATE QUANTITIES:
450 cubic metres Heavy Rock Riprap (Class 1)
44 piles Pile Set-up (Driven Piles)
44 metres Pile Tip Reinforcement
436 metres Pile Driving
22 699 kg Plain Reinforcing Steel - Supply
25 661 kg Corrosion Resistant Reinforcing Steel -Supply
977 kg Stainless Reinforcing Steel - Supply
49 337 kg Reinforcing Steel - Place
110 tonnes Asphalt Concrete Pavement - Mix Type H2 (PG 58-34)
32 600 tonnes Supply of Aggregates - No Option
16 700 tonnes Granular Fill Des. 2 Class 25
9 600 tonnes Granular Base Course Des. 2 Class 25
81 700 cubic metres Common Excavation
36 600 square metres Borrow Reclamation
36 600 square metres Topsoil Replacement
Contractor to supply all materials.
Contract Completion Date: July 31, 2028