GOC6535422 + GOC6535424 - CS - GOC6535422 + GOC6535424 - CS - MM – Standard Operating Procedures (Канада - Тендер #66926559) | ||
| ||
| Для перевода текста тендера на нужный язык воспользуйтесь приложением: | ||
Страна: Канада (другие тендеры и закупки Канада) Организатор тендера: www.merx.com Номер конкурса: 66926559 Дата публикации: 12-09-2025 Источник тендера: www.merx.com |
||
0000302564
Issuing OrganizationBGIS - PWGSC RP1
Solicitation TypeRFP - Request for Proposal (Formal)
Solicitation NumberGOC6535422 + GOC6535424 - CS
TitleGOC6535422 + GOC6535424 - CS - MM – Standard Operating Procedures
Source IDPU.DP.Que..8088.29965.C826102
Canada, North West Territories, All of Northwest Territories
Description
Scope of Work/Overview:
Objective: To update Standard Operating Procedures in accordance with BMP NCL 2025-26 and CLC requirements. The updated SOP shall reflect actual building systems and operation.
Additional Description:
These projects are based on the National program to establish Standard Operating Procedures (SOP) for the boilers, pressure vessels, and HVAC systems in accordance with BMP NCL 2025-2026 and
CLC requirements. The SOP"s are to be reviewed and updated at least every five years, after major modifications to the systems, or substantial changes to federal regulations and policies or to
applicable provincial/territorial legislation. The objective is to develop and maintain SOPs that detail requirements and procedures for operation, inspection, testing, cleaning, maintenance
and calibration of mechanical systems (including individual equipment and sensors). The revision of the SOP must capture all related HVAC systems, boilers and pressure vessels. This includes
all regulated equipment that are being inspected by Authorities Having Jurisdiction (AHJ), including but not limited to pressure tanks, compressor tanks, and expansion tanks.The Consultant
shall not blindly copy paste information from the previous HVAC SOP. The Consultant must perform the necessary site visits, investigate existing systems/equipment, review documentation
available and interview on-site maintenance personel in order to accurately report the information in the HVAC SOP. The Consultant shall revise (or create as necessary) systems schematics,
description, sequences of operation, equipment tables/sheets/pictures, etc within the report. Any image quality or formatting issue within the document shall be addressed by the Consultant.
Consultant to request to BGIS PM previous projects information that apply to this scope in order to include in the SOP"s.
-Follow SoW as detailed in this document and the attached M05EN - HVAC Standard Operating Procedures.
-HBlock diagrams to be created as an editable file. (non flattened within word native file)
-Up to date sequencing.
-Consultant to provide a final Microsoft Word (fully editable file with schematics and tables) document along with a PDF file. In addition, Consultant shall provide a blank template for future
amendments to the document. Consultant to provide two (2) hard copies in binders.
Sep 12, 2025 07:55 AM MDT
Bid IntentNot Available
Question Acceptance DeadlineSep 19, 2025 02:00 PM MDT
Questions are submitted onlineYes
Closing DateSep 29, 2025 02:00 PM MDT
Onsite VisitSep 16, 2025 09:30 AM MDT
Denise Sandulak
204-333-6294
Denise.Sandulak@bgis.com
Acknowledgement
By submitting our response to this solicitation, we confirm that we have read and agree to comply with the terms and conditions of this ITT, and we agree to provide, upon request, all
documentation without modification as defined in this ITT. BGIS reserves the right to reject our submission should BGIS fail to receive the required documentation.
Onsite Visit
AttendanceRecommended
Event dateSep 16, 2025 09:30 AM MDT
Location5010- 49 & 5010- 50 Avenue, Yellowknife, NT
Event Note
Mandatory On-Site Visit on Tuesday, September 16, 2025 at 9:30 am
Meet BGIS Tech or Project Manager at sign in Desk
Security Requirements: DOS and Reliability
All individual attending the site visit must bring their own Personal Protection Equipment (PPE)
All Covid-19 Guidelines must be followed.
Electronic Bid Submission
No pricing in this envelope
Bid Documents List| Item Name | Description | Mandatory | Limited to 1 file |
|---|---|---|---|
| Bid Documents | Documents defining the proposal | Yes | No |
| No entries | |||
Lump sum
Bid Documents List| Item Name | Description | Mandatory | Limited to 1 file |
|---|---|---|---|
| Bid Documents | Documents defining the proposal | Yes | No |
| No entries | |||
Property Management Supplier Compliance (BGIS - RP4)