RFP-10-25 - RFP-10-25 Area D Stormwater Collection System Design, Area C & Oyster River Rest Area (Канада - Тендер #66805219) | ||
| ||
| Для перевода текста тендера на нужный язык воспользуйтесь приложением: | ||
Страна: Канада (другие тендеры и закупки Канада) Организатор тендера: www.merx.com Номер конкурса: 66805219 Дата публикации: 08-09-2025 Источник тендера: www.merx.com |
||
Seeking engineering and planning consultants to advance stormwater utility systems planning and design for two priority catchments in Electoral Area D, building on a 2025 drainage study.
00004706053
Issuing OrganizationStrathcona Regional District
Solicitation TypeRFP - Request for Proposal (Formal)
Solicitation NumberRFP-10-25
TitleRFP-10-25 Area D Stormwater Collection System Design, Area C & Oyster River Rest Area
Source IDSCRIBE
British Columbia
Purchase TypeNot Stated
2025/09/08 09:26:00 AM EDT
Closing Date2025/10/10 03:00:00 PM EDT
Sheena Fisher
250-830-6700
Procurement@srd.ca
The Strathcona Regional District (SRD) is seeking proposals from qualified engineering and planning consultants to advance the planning and design of stormwater utility systems within two
identified priority catchments in Electoral Area D. This work builds on the findings of the 2025 SRD Area D Drainage Study (McElhanney Ltd., March 26, 2025), which assessed the feasibility of
implementing a formal stormwater utility across 14 sub-catchments in the region.
The SRD is seeking to advance the Area D storm drainage system project by retaining a qualified consulting engineering company to:
Confirm Concept Feasibility
• Validate catchment boundaries, system alignments, and design assumptions from the 2025 drainage study
• Confirm feasibility of proposed gravity-flow piped systems within existing public corridors or flag where easements or design alternatives are required
Develop Detailed Design Drawings & Cost Estimate
• Advance detailed design, including alignment drawings, profiles, specifications, and construction sequencing where appropriate
• Develop a Class B cost estimate
Support Coordination with Permitting Authorities and Landowners
• Coordinate with the Ministry of Transportation and Transit (MoTT) and other relevant regulators to support future permitting and construction approvals
• Undertake environmental review of proposed outfall areas and receiving environments to:
o assess outfall suitability and resilience;
o identify permitting requirements
o evaluate potential physical, ecological, or regulatory barriers to construction or discharge
• Support early engagement with landowners where statutory rights-of-way (SRWs) or access agreements may be require