Issuing OrganizationBGIS - PWGSC RP1
Owner OrganizationRP1
Solicitation TypeRFQ - Request for Quote (Formal)
Solicitation NumberGOC5180071-CS
TitleIntegrated Systems Testing of Fire Protection and Life Safety- CS
Source IDPU.DP.Que..8088.29965.C933877
Canada, British Columbia, Vancouver, Coast & Mountains
Delivery PointB.C. Immigration Holding Centre--13130 76th Ave, Surrey, BC V3W 2V6
Description
As per the requirements of Section 6.8 of the 2015 National Fire Code of Canada (NFCC), interconnections between fire protection and life safety systems must be tested in accordance
with CAN/ULC-S1001 "Integrated Systems Testing of Fire Protection and Life Safety Systems". The implementation of an Integrated Test Plan to permit the performance of this test is required at 5
year intervals as per CAN/ULC-S1001.
The intent of this project is to create and implement testing methodology for verification, documentation and operations of interconnections between fire protection and life safety
systems of BC immigration holding centre and that it be tested as per CAN/ULC-S1001 "Integrated Systems Testing of Fire Protection and Life Safety Systems". This project is intended to satisfy
the requirements of Integrated systems testing as required by NBC, NFC, and other applicable codes. Consultant shall engage all required design professionals, relvant sub-contractors as
required, installing contractors, verifying parties as required to create the test plans, identify all interconnected systems and required sequence of operations, identify integration or system
issues and provide recommendations, and also be responsible for oversight and implementation of the prescribed tests and provide necessary documentation at the time of completion of the
project.
Final Study Report to include Testing Procedures, Final testing results and Any recommendations or rectification to split in two distinct section of code compliance and nice to have
features, based on actual test results performed for this report.
Details of testing and final report requirements are detailed in the CAN/ULC-S1001-11 document.
.As per the requirements of Section 6.8 of the 2015 National Fire Code of Canada (NFCC), interconnections between fire protection and life safety systems must be tested in accordance
with CAN/ULC-S1001 "Integrated Systems Testing of Fire Protection and Life Safety Systems". The implementation of an Integrated Test Plan to permit the performance of this test is required at 5
year intervals as per CAN/ULC-S1001.
The intent of this project is to create and implement testing methodology for verification, documentation and operations of interconnections between fire protection and life safety
systems of BC immigration holding centre and that it be tested as per CAN/ULC-S1001 "Integrated Systems Testing of Fire Protection and Life Safety Systems". This project is intended to satisfy
the requirements of Integrated systems testing as required by NBC, NFC, and other applicable codes. Consultant shall engage all required design professionals, relvant sub-contractors as
required, installing contractors, verifying parties as required to create the test plans, identify all interconnected systems and required sequence of operations, identify integration or system
issues and provide recommendations, and also be responsible for oversight and implementation of the prescribed tests and provide necessary documentation at the time of completion of the
project.
Final Study Report to include Testing Procedures, Final testing results and Any recommendations or rectification to split in two distinct section of code compliance and nice to have
features, based on actual test results performed for this report.
Details of testing and final report requirements are detailed in the CAN/ULC-S1001-11 document.
.
Aug 13, 2025 02:41 PM PDT
Bid IntentNot Available
Question Acceptance DeadlineAug 19, 2025 02:00 PM PDT
Questions are submitted onlineYes
Closing DateAug 27, 2025 02:00 PM PDT
Feras Daou
FERAS.DAOU@BGIS.COM
Electronic Bid Submission
PricingLump sum
Bid Documents List| Item Name | Description | Mandatory | Limited to 1 file |
|---|---|---|---|
| Bid Documents | Bid Documents as identified in the solicitation documents | Yes | No |
| No entries | |||