Supply of Instrument and Fire & Gas Cables (Бахрейн - Тендер #60111956) | ||
| ||
| Для перевода текста тендера на нужный язык воспользуйтесь приложением: | ||
Страна: Бахрейн (другие тендеры и закупки Бахрейн) Организатор тендера: Tender Board - Kingdom of Bahrain Номер конкурса: 60111956 Дата публикации: 23-12-2024 Источник тендера: Tender Board - Kingdom of Bahrain |
||
Tender Number: 1014/2024/BTB (TP-1250-2024)
PA Ref Number: TP-1250-2024
Tender DescriptionBapco Upstream aims to lay 2 x 24 inches pipelines of regasified liquid natural gas (RLNG) between Alba Gas Station Jump Over to Al Dur Distribution Point including two new stations Askar Valve Station and Hafeera Valve Station. As part of phase 1B scope, Bapco upstream will be installing above ground 2 x 24 inches pipelines from Alba Gas Station Jump Over to Askar Valve Station. In addition to the pipeline, a new intermediate valve station – Askar Valve station will be constructed as part of phase-1B scope. For the safe operation of the Pipelines and the facilities, Pressure, Temperature & Level Transmitters, Shut Down Valves, Fire and Gas Detectors & Devices will be installed. To connect these Pressure, Temperature & Level Transmitters, Shut Down Valves, Fire and Gas Detectors and Devices to the Programmable Logic Controller Panels inside the Telemetry Building (PLC) Instrument and Fire & Gas Cables will be needed.
Issued by BAPCO UPSTREAM W.L.L Category/Sector General Internal/External External Initial Bond BD 500 Bid Validity / Initial Bond Validity Period (Days) 180 days Tender Fees BD 30 Contract Duration 1 Year Is Alternate Bid Allowed Yes Publish Date Sunday, 22 December 2024 Purchase Before Tuesday, 21 January 2025 Closing Date Wednesday, 29 January 2025 Opening Date Thursday, 30 January 2025 Additional NotesSupply of Instrument and Fire & Gas Cables
Bapco Upstream aims to lay 2 x 24 inches pipelines of regasified liquid natural gas (RLNG) between Alba Gas Station Jump Over to Al Dur Distribution Point including two new stations Askar Valve Station and Hafeera Valve Station. As part of phase 1B scope, Bapco upstream will be installing above ground 2 x 24 inches pipelines from Alba Gas Station Jump Over to Askar Valve Station. In addition to the pipeline, a new intermediate valve station – Askar Valve station will be constructed as part of phase-1B scope. For the safe operation of the Pipelines and the facilities, Pressure, Temperature & Level Transmitters, Shut Down Valves, Fire and Gas Detectors & Devices will be installed. To connect these Pressure, Temperature & Level Transmitters, Shut Down Valves, Fire and Gas Detectors and Devices to the Programmable Logic Controller Panels inside the Telemetry Building (PLC) Instrument and Fire & Gas Cables will be needed.
توريد أجهزة وكابلات الحريق والغاز
تهدف شركة بابكو للتنقيب عن النفط إلى مد خطوط أنابيب مقاس 2 × 24 بوصة من الغاز الطبيعي المسال المعاد تحويله إلى غاز (RLNG) بين محطة وقود ألبا الانتقال إلى نقطة توزيع الدور، بما في ذلك محطتين جديدتين: محطة عسكر للصمامات ومحطة صمامات حفيرة. كجزء من نطاق المرحلة 1ب، ستقوم شركة بابكو بتركيب خطوط أنابيب فوق سطح الأرض مقاس 2 × 24 بوصة من محطة وقود ألبا إلى محطة صمامات عسكر. بالإضافة إلى خط الأنابيب، سيتم إنشاء محطة صمامات وسيطة جديدة – محطة عسكر للصمامات كجزء من نطاق المرحلة 1ب. من أجل التشغيل الآمن لخطوط الأنابيب والمرافق، سيتم تركيب أجهزة إرسال الضغط ودرجة الحرارة والمستوى وصمامات الإغلاق وأجهزة الكشف عن الحرائق والغاز. لتوصيل أجهزة إرسال الضغط ودرجة الحرارة والمستوى وصمامات الإغلاق وكاشفات الحريق والغاز والأجهزة بلوحات التحكم المنطقي القابلة للبرمجة داخل جهاز القياس عن بعد (PLC) وكابلات الحريق والغاز.
Bidders shall meet the below criteria to be evaluated further:
Bidder’s compliance to the Datasheet attached in the tender package
Proposed Manufacturer is from Bapco Upstream’s Approved Vendors List
Delivery Condition - DDP Bahrain (Bapco Upstream Stores)
For further inquiries please contact on:
BAPCO UPSTREAM W.L.L
17148000