Long-term contract (3 yr. + 1yr. + 1 yr.) for the Maintenance and Repair of Automatic Doors in U ... Request for EOI
Reference: EOIUNPD21224
Beneficiary countries: United States of America
Registration level: Basic
Published on: 10-May-2023
Deadline on: 24-May-2023 00:00 0.00
Description
Under the direct supervision of Plant Engineering Section (PES), the contractor shall furnish all labour, material, tools, instruments, meters, gauges, transportation, and parts necessary
to perform preventative maintenance, inspection, adjustment, repairs and/or replacement necessary to keep all automatic doors listed below, in good functioning condition. All installation
and maintenance services must comply with the manufacturing standards and recommendations. The services can be broken down into three categories as listed below: i. Regular Preventative
Maintenance Services: Using the applicable Operating Manual and manufacturers’ recommendations, the contractor shall perform scheduled preventative maintenance and a safety inspection
to ensure that the automatic doors are in good working condition. Preventative Maintenance shall occur within 30 days of contract execution and thereafter either annually in July or as
specified in the Operating Manual, whichever term is more frequent. Preventative Maintenance Schedule shall include but not be limited to: • Safety compliance check and adjustment to
assure conformity with ANSI 156.10 & ANSI 156.19. • Adjustment of Operator speeds if required • Alignment, tightening, lubrication and inspection of door components • Inspection
of all controls, activation, and safety zones • Inspection and tightening of guide rails • Inspection and adjustment of hydraulic pumps and/or air compressors • Inspection and
service of manual door components including closers, hinges, and pivots. • Inspect tie-ins to security systems, as required. Upon completion of each service, the contractor is to ensure
all Automatic Doors are fully functional. ii. Emergency Service: The Contractor shall provide twenty-four (24) hours, seven (7) days a week emergency service to maintain the automatic
doors listed in Appendix 1 in proper operation. Contractor shall respond to the premises to investigate and repair automatic door service calls within 4 hours of notification from the
Plant Engineering Section (PES). Technician shall carry tools and spare parts to repair common malfunctions. iii. Major Repairs and Parts Replacement: Equipment and parts shall be
repaired or replaced as necessary to correct each malfunction, deficiency, or other unsatisfactory condition discovered. Replacement parts furnished by the contractor shall be authorized
parts from dealer of equal or better quality and directly interchangeable with the replaced parts. Repairs shall be accomplished in accordance with applicable maintenance manuals or, in
the absence of such manuals, in accordance with normal commercial and engineering practices. Except for undertaking unforeseen emergency, all repairs and rectifications works must be
approved by PES. Contractor shall provide and install any required spare part within three (3) business days of approval by the Plant Engineering Section (PES).