National Consultancy Company Supervision of construction work for risk mitigation works in Lam Hoa site, Quang Binh province (примерный перевод: строительная консалтинговая компания по надзору за строительством работы по снижению рисков в Лам Хоа, провинция Куанг Бинь) (Вьетнам - Тендер #4613282) | ||
| ||
Для перевода текста тендера на нужный язык воспользуйтесь приложением: | ||
Страна: Вьетнам (другие тендеры и закупки Вьетнам) Организатор тендера: United Nations Procurement Notices (UNDP) Номер конкурса: 4613282 Дата публикации: 21-02-2019 Источник тендера: Тендеры Организации Объединенных Наций |
||
National Consultancy Company Supervision of construction work for risk mitigation works in Lam Hoa site, Quang Binh province | ||
---|---|---|
Procurement Process : | RFP - Request for proposal | |
Office : | UNDP Country Office - VIET NAM | |
Deadline : | 06-Mar-19 | |
Posted on : | 21-Feb-19 | |
Development Area : | SERVICES | |
Reference Number : | 53529 | |
Link to Atlas Project : Non-UNDP Project |
||
Documents : |
||
Overview :
UNDP Vietnam is seeking for a National Consultancy Company Supervision of construction work for risk mitigation works in Lam Hoa site, Quang Binh province. The objective of the work is construction supervision for all works of minimizing the risk of POP Pesticide pollution in Lam Hoa commune, Tuyen Hoa district, Quang Binh province. - Based on the requirement of the explanation and design drawing for all activities of treating environmental pollution in Lam Hoa commune, Tuyen Hoa district, Quang Binh province. Develop the overall construction supervision program: in which, identify clearly all contents of the basic construction items need to be supervised, and the environmental items shall coordinate with PMU and VEA to implement. (Explanation and design drawing are attached). - Based on the construction plan of the construction unit, develop an the appropriate monitoring plan, in which, should give the landmarks that the consultant should be at the contaminated area to construction supervision. The construction plan should be approved by PMU before implementation. - Implement fully monitoring contents according proposed plan, including the following minimum contents: + Monitoring the amount of contaminated soils which have excavated from the contaminated areas and put into the landfill areas; monitoring the transport activity of contaminated soil without spillage during transport. + Monitoring the sampling process and sample analysis after excavation at contaminated site of the two areas. + Guarantee the structure of burial pit meet the requirement at technical drawing. + The structure of fence and road must meet the requirement at technical drawing. + The actual amount of clean soil for land return at all hot spots. - Take soil samples for analyzing at laboratory. Specifically in 09 hot spots: each hot spot takes 02 soil samples, including one sample at the bottom of the excavation hole (after the construction unit has completed excavation) and 01 composite sample representing the volume of excavated soil. - Develop the report of construction supervision all works to minimize risk of POP Pesticide pollution at contaminated areas in Lam Hoa commune, Tuyen Hoa district, Quang Binh province Request for Proposal with enclosed TOR and evaluation criteria are in the attached files. Interested offerors are invited to submit technical proposals, financial proposals and other information following guidance in the Request for Proposal to: Procurement Unit UNDP Viet Nam 304 Kim Ma, Ha Noi, Viet Nam Tel: (+84 24) 38500100 Direct: (+84 24) 38500195 Email: nguyen.thai.duong@undp.org with notification by email (without attachment) to: that the bidder has submitted proposal.UNDP will not be responsible for the missing of proposal if the bidder does not send notification email to above address. Deadline for submissions: 5pm 06 March 2019 |