Background
UNDP started to implement the new country programme (2018 -2022) in Myanmar. The country programme has two main outcomes – governance and sustainable peace, and sustainable
and inclusive growth. Both outcomes are closely aligned with national priorities and the MSDP, which in turn is inspired by the 2030 Agenda and the 17 Sustainable Development
Goals (SDGs). In a change of office human resources where more staff are required and the Resident Coordinator Office is expanding its staffing to support the Humanitarian
Coordinator in response to increasing demand of UN Support from the government.
To fulfill its mandate, UNDP Myanmar should ensure a better working environment provided to all staff where optimum office space is utilized with adequate equipment/furniture
for staff best performance. In view of these factors, it is required for the UNDP Myanmar office to complete the office renovation in Country Office with the proper layouts with
standard office furniture for reception and walkways corridors
In order to complete the above arrangement in time, the office is looking for a company to provide necessary furniture and install them in time to meet the requirements of the
staff working environment in UNDP Yangon office
Objective.
Professional renovation service and provision of adequate Furniture are required for refurbishment and renovation of UNDP Yangon Office Ground Floor (Phase 1) and 1st & 2nd
Floor Corridors (Phase 2). The objective of this assignment is renovation, renovation works and furnishing, including, supervision of works.
Scope of work, activities, tasks, deliverables and timelines.
In close coordination with UNDP Administrative Unit, CSTS in Yangon and under overall supervision of the Head of CSTS, the Renovation Services and Supply of furniture will be
required to complete the office interior renovation project of both phases.
Phase 1: Ground Floor
Phase 2: 1st & 2nd Floor Corridors
Task A. Perform all required site surveys and measurements and liaise with UNDP Administrative Unit, CSTS in Yangon and execute the project renovation services:
- Arrange site surveys and data collection.
- Review the plans, including: all necessary floor plans, sections, elevations, schemes, Furniture layouts and specifications
- Develop detailed time schedule for the drawing phase execution
- Develop works execution time schedule.
- Revise the drawing documentation and BOQ as needed until the price estimates fit in UNDP construction budget expectation.
Task B. Renovation services and supervision.
- Submit Renovations works execution schedules.
- Complete the renovation work as per agreed plan.
- Provide comprehensive renovation site supervision.
- Organize all necessary meetings with UNDP.
- Provide quality assurance and control.
- Issuing all necessary certificates.
- Bidder shall consider the work station available for the connection of the electrical switches for power, cable and telephone networks
- Supply Furnitures, fix them as per attached drawing
-
Other UN agencies, funds or programs should have the right to purchase the same or similar services from selected Contractor(s) at their sole discretion under this
terms and conditions
Proposed duration.
- Task A 10 working days
- Task B Interior renovation and furniture provision works duration 1 month
- Defect liability period 6 months
REPORTING OBLIGATIONS
|
Name of the report
|
Deadline for submission
|
1
|
Final technical and accompanying documents and assessments for office rooms:
- Technical description;
- Bill of quantities with estimated cost
- Technical specification for furniture
|
10 days after signing the contract
|
Consultant’s outputs for Work Plan 1:
|
|
Name of the report
|
Period/deadline for submission
|
1
|
Weekly reports on the process and progress of renovation of the project office in accordance to the TOR.
|
Every week, following commencement of civil works for renovation of project office until
|
2
|
Renovation Project service and supply the furniture for Office
|
Estimated commencement of works: as soon as the contract is awarded, at the latest on 30 November 2019
|
3
|
Final delivery of the renovation made
|
At maximum, 5 days after completion of renovation works and supply the furniture and equipment.
|
Consultant’s outputs for Work Plan 2:
The contractor will deliver an electronic copy of technical BOQ and accompanying documents to UNDP in both Myanmar and English languages.
Qualifications, Specialized Experience and additional competencies.
- Proven track record in successful implementation of similar projects in the past 2 years.
- Professional expertise and excellent background in construction works and supervision.
- The constructor must have the necessary experience and expertise in the supply and installation of office furniture and equipment
Annexes:
Annex 1. Bill of Quantities
Annex 2. Drawings and Layout
Annex 3. Check-list for submission
Annex 4. Form for Submitting Supplier’s Quotation
Annex 5. General Terms and Conditions for Contract
|