EBRD - Supervision of Civil Works on: M3 Vulcanesti Bypass, km 0+000 – km 8+580 (EC NIF), M3 Slobozia Mare Bypass, km 0+000 – km 18+290 (EBRD) (Молдова - Тендер #1773918) | ||
| ||
Для перевода текста тендера на нужный язык воспользуйтесь приложением: | ||
Страна: Молдова (другие тендеры и закупки Молдова) Номер конкурса: 1773918 Дата публикации: 12-07-2017 Источник тендера: Единая система закупок Европейского союза TED |
||
The Executing Agency/Client Contact Person:State Road Administration. Attention: Ms. Diana Lupu, Chief of the Procurement Section, Office 401, Bucuriei str. 12A, MD 2004 Chisinau, Republic of Moldova. E-mail: procurement@asd.md Website: www.asd.md
Instead ofMoldova-Chisinau: EBRD - Supervision of Civil Works on: M3 Chisinau – Giurgiulesti Road, km 151+200 – km 171+290 and km 179+650 – km 190+750 (EBRD), M3 Vulcanesti Bypass, km 0+000 – km 8+580 (EC NIF), M3 Slobozia Mare Bypass, km 0+000 – km 18+290 (EBRD)
[...]
This invitation for expressions of interest follows the General Procurement Notice No. 8166-GPN-45094 and General Procurement Notice No. 6239-GNP-41442 for this project ...
[...]
... defined in the project procurement plan:
• RSP/W9/04 –Rehabilitation of M3 Chisinau – Giurgiulesti road km 151+200 – km 171+290 and km 179+650 – km 190+750”
The rehabilitation project under this contract comprises two sections of M3 Road. The first section is between km 151+200 to km 171+290. The second section of M3 Road runs from the km 179+650 to km 190+750. The length of first section is 20.1 km in length from Ciumai village to Vulcăneşti town. The existing road is mainly a two-lane single carriageway paved road. The second section measures 11.1 km and runs south from Vulcăneşti to the start of a newly designed bypass for Slobozia Mare. The rehabilitation of these sections is expected to follow the existing road alignment, with the possible exception of limited realignments to improve geometric characteristics, eliminate safety hazards, or avoid areas subject to severe soil erosion. The works of these sections include pavement overlays, construction of a new bridge with three equal spans of 54.7 m long and 13 m wide with precast pre-stressed concrete T-beams for superstructure. Also, two bridges are to be rehabilitated. The lengths of the bridges are 14.5 m and 6 m and the widths 12.5 m and 13.7 m, respectively. Additionally, reconstruction of a roundabout is envisaged. Slight realignments are foreseen to improve the road safety conditions in Ciumai and Burlăceni villages according to the drawings.
• RSP/W9/05 – Construction of M3 Vulcanesti Bypass km 0+000 – km 8+580
[...]
• RSP/W9/06 – Construction of M3 Slobozia Mare Bypass, km 0+000 - km 18+290
[...]
Also, the Consultant shall envisage the group of following technical support staff:
[...]
• 3 (three) Surveyors
• 3 (three) Laboratory Assistants
• 3 (three) Designer’s Representatives
[...]
Expressions of interest must be delivered to the Client in an envelope marked "EXPRESSION OF INTEREST for Moldova Road Sector Program: Supervision of Civil Works on M3 Chisinau – Giurgiulesti road, on M3 Vulcanesti Bypass and on M3 Slobozia Mare Bypass", ...
ReadMoldova-Chisinau: EBRD - Supervision of Civil Works on: M3 Vulcanesti Bypass, km 0+000 – km 8+580 (EC NIF), M3 Slobozia Mare Bypass, km 0+000 – km 18+290 (EBRD)
[...]
This invitation for expressions of interest follows the General Procurement Notice No. 8166-GPN-45094 for this project ...
[...]
... defined in the project procurement plan:
• RSP/W9/04 – Construction of M3 Vulcanesti Bypass km 0+000 – km 8+580
[...]
• RSP/W9/05 – Construction of M3 Slobozia Mare Bypass, km 0+000 - km 18+290
[...]
Also, the Consultant shall envisage the group of following technical support staff:
[...]
• 2 (two) Surveyors
• 2 (two) Laboratory Assistants
• 2 (two) Designer"s Representatives
[...]
Expressions of interest must be delivered to the Client in an envelope marked "EXPRESSION OF INTEREST for Moldova Road Sector Program: Supervision of Civil Works on M3 Vulcanesti Bypass and on M3 Slobozia Mare Bypass", ...