EBRD - EGAS Energy Efficiency Project - Consultant for the Project Implementation Unit (PIU) (примерный перевод: Проект ЕБРР по энергоэффективности - Консультант по (ЕРБ)) (Египет - Тендер #3334282) | ||
| ||
Для перевода текста тендера на нужный язык воспользуйтесь приложением: | ||
Страна: Египет (другие тендеры и закупки Египет) Номер конкурса: 3334282 Дата публикации: 26-05-2018 Источник тендера: Единая система закупок Европейского союза TED |
||
Procurement Reference: 9102-EOI-48901
Assignment name: EGAS Energy Efficiency Project — Consultant for the Project Implementation Unit (PIU)
Country: Egypt
Business sector: Natural Resources
Project ID: 48901
Funding source EBRD loan proceeds
Type of contract: Consultancy Services
Type of notice: Request for Proposals — Single Stage Selection
Issue date: 21.5.2018
Closing date: 5.7.2018
Executing Agency (Client):
The Egyptian Natural Gas Company (GASCO), Maddi Ring Road Exit 12, 90th St., Fifth district, New Cairo — EGYPT
The Client Contact Persons
Eng. Ahmed Medhat ElSayed, Compressor Project and Gas manufacturing General Mg., ahmedmedhat@gasco.com.eg — +2 01158016655 and Dr. Eng. Ahmed El Tonbary, Project Manager, ENPPI, ahmed.eltonbary@enppi.com — Tel: +20 100 108 0666
Project Description:
The European Bank for Reconstruction and Development (the “EBRD” or the “Bank”) has agreed to provide a sovereign loan up to 200 000 000 USD to the Arab Republic of Egypt to be on-lent to Egyptian Natural Gas Holding Company (“EGAS”) and its subsidiary the Egyptian Natural Gas Company (GASCO) (“GASCO”, or the “Company”, or the “Client”),established under the investment law nº 230 of year 1989 amended by law 72 of year 2017 and their amendments, collaboratively the sole operator of the natural gas system in Egypt. The proposed project consists of energy efficiency investments in the Egyptian gas pipeline infrastructure fully consistent with the Bank’s Green Economy Transition Approach (“GET”), thereby contributing to the enhanced sustainability of the gas transmission market and to the expansion of the ongoing policy dialogue effort in energy efficiency in the oil and gas sector (the “Project”).
The Project intends to focus on energy efficiency investments comprising of waste heat recovery from compression stations at gas processing plants, including the Dahshour compression station. Subject to agreement between GASCO and EBRD additional components may be included in the project during the implementation phase.
The services required to be rendered by the Consultant for the following components of the project to be financed by the Bank (tentative list subject to changes):
a) Dahshour Compression Station — Lot1 Compression Trains, including O and M and spare parts,
b) Dahshour Compression Station — Lot2 WHRU and ORC technologies, including O and M and spare parts,
c) Dahshour Compression Station — Lot3 Grid Connection, including O and M and spare parts, and
d) Dahshour Compression Station — Lot 4 Balance of plant Instrumentation and Control, including O&M and spare parts.
Assignment Description:
The Client now intends to select and contract a consulting company (the Consultant) to the Assignment, on the basis of the Consultancy Procurement Document (CPD) in attachment. The expected outcome of the Assignment is a successful implementation of the Project.
The selected Consultant is expected to provide the following services:
1) support in the finalisation of the technical documentation of the Project to ensure compliance with EBRD’s Procurement Policies and Rules (PP and R);
2) development of Operating Procedures for the Project Implementation Unit;
3) support during the Procurement Process;
4) support during the Evaluation Process;
5) support during Contract finalisation;
6) environmental and Social Action Plan;
Consultant Selection Procedure: single stage open competitive selection Interested firms of groups of firms are invited to submit a Technical and Financial Proposal.
Assignment Start Date and Duration: the Assignment is expected to start in October 2018 and has an estimated overall duration of about 36 months.
Input Estimate for the Assignment: the estimated input of the key experts will be 100 man-months. Intermittent inputs are expected by the experts.
Subject to availability of funding, the performance of the selected Consultant and the specific needs of the Client the Assignment may be extended beyond the current scope.
Funding Source: it is anticipated that the contract will be financed by EBRD loan proceeds. Selection and contracting is subject to the availability of funding.
Eligibility: there are no eligibility restrictions based on the consultant"s country of origin.
Submission Requirements: in order to determine the capability and experience of Consultants seeking to be selected, the consultant shall submit a Response in accordance with the Consultancy Procurement Document (CPD). Please find it in the following link:
http://www.ebrd.com/work-with-us/procurement/p-pn-180521g.html
Important Notes:
1) The selection will normally be made from the Proposals received in response to this notification only, on the basis of the selection criteria set out in the CPD. The highestranked consultant will be selected and be invited to negotiate the contract, subject to availability of funding.
2) Any updates of and clarifications on this procurement notice and/or the CPD shall be announced as updates on this notice, without any other notification. In the event of changes to the CPD, consultants will need to download the updated version of the CPD. Consultants are required to periodically check the notice for updates. Failure to take the updates into account while preparing the Proposal may result in disqualification or penalties to the scores in the evaluation.